Concrete Slab Calculator (Cubic Yards & Bag Count)

Compute slab volume in cubic yards or cubic meters from its dimensions. It also gives bag counts for 60-lb and 80-lb mixes plus a cost estimate at typical ready-mix rates.

Reviewed and updated

How to use
  1. Enter slab length, width, and thickness.
  2. Check how many 60-lb or 80-lb bags it takes.
  3. See the rough cost at ready-mix rates.
Common slab
Concrete needed (with waste)
2.69 yd³

20 ft × 10 ft × 6 in slab, 10% waste

Cubic metres
2.06 m³
Slab area
200 ft²
80 lb bags
133 bags
60 lb bags
177 bags
Estimates only, allow for waste and confirm against local building codes and supplier specs.
Was this helpful?

Volume first, then convert to cubic yards

Concrete is ordered by the cubic yard, but a slab is measured in feet and inches. Get the volume in cubic feet, then divide by 27 (a cubic yard is 3 × 3 × 3 ft). Forgetting that divide-by-27 step is the most common ordering mistake.

yd³ = length × width × thickness ÷ 27

Thickness goes in as feet: a 4-inch slab is 4 ÷ 12 = 0.333 ft, a 6-inch slab is 0.5 ft. So 20 ft × 10 ft × 0.333 ft = 66.7 ft³, and 66.7 ÷ 27 = 2.47 yd³.

Slab size, volume and 80-lb bags

Slab (4″ thick)Cubic yards80-lb bags
8 × 8 ft0.79 yd³36
10 × 10 ft1.23 yd³56
12 × 12 ft1.78 yd³80
20 × 10 ft2.47 yd³112
20 × 20 ft4.94 yd³223
24 × 24 ft7.11 yd³320

Bags use 45 per cubic yard for the 80-lb size, before any waste allowance. A 6-inch slab needs 50% more of everything than the 4-inch figures above.

Getting the order right

  • Add a waste factor. 10% is normal for a first pour, 5% for experienced crews. It covers spillage, an uneven base, and settling.
  • Bags vs ready-mix. A 2.5 yd³ slab is over 110 80-lb bags to mix by hand — a job for ready-mix delivery. Bags suit small pads and repairs.
  • Base and joints matter more than a bit of extra concrete. Pour over 3 to 4 inches of compacted gravel, and cut control joints every 4 to 6 ft so shrinkage cracks land where you want them.

Common questions

How do I work out cubic yards of concrete?

Multiply length by width by thickness, all in feet, to get cubic feet, then divide by 27 to get cubic yards. A 20 by 10 ft slab at 4 inches thick is 20 x 10 x 0.333 = 66.7 cubic feet, which is 2.47 cubic yards.

How many 80-lb bags of concrete are in a cubic yard?

About 45 bags of 80-lb pre-mix, or 60 bags of the 60-lb size. Bags only make sense for small jobs; past roughly one cubic yard, ready-mix delivery is cheaper and easier.

Should I order a bit extra?

Yes. Add 5 to 10% for spillage, uneven subgrade, and settling. Running short mid-pour leaves a cold joint, so it is safer to over-order slightly.

Do I use 4-inch or 6-inch thickness?

Four inches suits patios, walkways, and car driveways. Six inches is for driveways that carry trucks, and for heavier loads. Going to 6 inches raises the concrete volume by half.