Building & DIY

Paver Calculator (Patio & Walkway)

Figures out how many pavers you need for a patio or walkway from the area and paver size. It accounts for joint width, pattern waste, and includes the base material volume in cubic yards.

Reviewed and updated

How to use
  1. Enter the project area or its length and width.
  2. Enter the paver dimensions and joint width.
  3. Pick the laying pattern for the right waste factor.
Common paver
Pavers needed (with waste)

Patio area
Per paver
Base gravel
Joint sand
Estimates only, allow for waste and confirm against local building codes and supplier specs.
Was this helpful?

Pavers needed is area divided by paver area, plus waste

pavers = patio area ÷ paver area × ( 1 + waste )

Work in one unit. A 12 × 8 inch paver covers (12÷12) × (8÷12) = 0.67 sq ft. Divide your patio's square footage by that, then multiply by one plus your waste factor and round up. The waste covers edge cuts and breakage, so it is not optional.

Coverage by paver size

Paver sizeSq ft eachPer 100 sq ftPer 400 sq ft patio
8″ × 3.625″ brick0.205002,000
12″ × 8″ concrete0.67149596
12″ × 12″ concrete1.00100400
18″ × 12″ concrete1.5067268
18″ × 18″ stone2.2544176
24″ × 24″ porcelain4.0025100

These are before waste. Larger pavers cut the count and the number of joints, but a single broken one is a bigger loss.

Waste depends on the pattern

PatternAdd for waste
Running bond5–7%
Basket weave7–10%
Herringbone10–15%
Circular / fan15–25%

Diagonal patterns force more angled cuts at the borders, which is where the extra material goes.

Do not forget the base

  • Base depth. A typical patio wants about 4″ of compacted base — 2 to 3″ of gravel plus 1 to 2″ of leveling sand. That is roughly 1.24 cubic yards per 100 sq ft.
  • Drainage slope. Fall of 1/8″ per foot away from the house keeps water off the surface without being visible.
  • Edge restraint. Without a border the pavers creep outward over time; budget for edging along every open side.

Common questions

How many pavers do I need for a 12 by 16 foot patio?

The area is 192 square feet. With standard 12 by 8 inch pavers (0.67 sq ft each) that is 287 pavers, and adding 10% for cuts and breakage rounds up to about 320.

What waste factor should I add?

Between 5 and 15% depending on the pattern. Running bond needs about 5 to 7%, herringbone 10 to 15% because of the angled edge cuts, and circular layouts 15 to 20%. Always round up so you have spares for repairs.

Do I count the joint gaps in the paver size?

For a close estimate you can ignore them, but a quarter-inch joint on a small paver adds a few percent of coverage. Adding the joint width to each paver dimension before dividing gives a slightly lower, more accurate count.

From the blog

Guides & how-tos

All articles →